Elevation profile
There is no elevation data in the track for the chart.
There is no elevation data in the track for the chart.
Paving stones 40% · Artificial surface 30% · Dirt 24%
Surface is defined for 93% of the route.
No access bans or fires nearby
We check satellite fire data and regional warnings.
This route was added from a track. Individual sections have not been checked in the field.
OpenStreetMap: https://www.openstreetmap.org/relation/13756510 Geometry imported from GPX. Trail conditions have not been checked in the field. Difficulty was estimated automatically from distance and elevation gain.
Before travelling, check trail access, restrictions and the weather forecast.
Conditions may have changed. Share a report after completing the route.
Be the first to confirm a completion and help other travellers.
Plan | A short ride along the southern avenues Allow 45–90 minutes for gentle riding or walking and sculpture stops. Add your approach and return to the exit separately. Repeating a section extends the outing if desired but is not necessary to explore this version.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Use the Biryulyovsky Dendropark stop and the operating underpass by the main entrance. Metro construction has changed the usual approach from Lipetskaya Street. Another accessible entrance is near the Elevatornaya Street stop; walk separately from the gate to the start of your chosen path. Check the current bus number and timetable before travelling.
Two lanes on the park side of Lipetskaya Street are closed for works. Follow current signs to a permitted stopping place outside the park, then enter on foot through an operating gate. The recreational path is not a vehicle access road.
No dedicated car park at the start of this version has been verified. Follow current street signs and construction barriers; keep park entrances and pedestrian approaches clear.
Use the Biryulyovsky Dendropark stop and the operating underpass by the main entrance. Metro construction has changed the usual approach from Lipetskaya Street. Another accessible entrance is near the Elevatornaya Street stop; walk separately from the gate to the start of your chosen path. Check the current bus number and timetable before travelling
Possible with caution: review the surface, difficult sections, and extra time for stops in advance.
Yes, GPX and KML are available on the route page. Open the map, download the file, and use it in a navigator before your trip; key route facts: 1.5 km, easy.
Moscow region
Blagoveshchenye: the footpath from Festivalnaya to Pesochny Lane
0.6 km↑ 12 mEasy
Prepared
Moscow region
Tsaritsyno Morning Path: Nerastankino and Park Pavilions
2.3 km↑ 40 mEasy
From track data
Moscow region
Obruchevsky Run beside Zapytaya Pond
2.2 km↑ 58 mEasy
From track data
Moscow region
A Short Run beside the Upper Samorodinka
1.5 km↑ 25 mEasy
From track data
Moscow region
From Oktyabrsky through Lesnaya Opushka to Makeyevka Pond
3.0 km↑ 21 mEasy
From track data
Reviews and questions 0
Log in to read the discussion and leave comments.
Ask about the route or its surface, or share your experience.