Elevation profile
There is no elevation data in the track for the chart.
There is no elevation data in the track for the chart.
Asphalt 19% · Improved surface 6% · Concrete 1% · Unknown 74%
Surface data covers 4.94 km of 19.3 km; the rest of the track is not yet classified.
No access bans or fires nearby
We check satellite fire data and regional warnings.
The description, logistics and points of interest were prepared using maps and open sources. Trail conditions may change.
Route data was imported from GPX and has not been field-verified.
Before travelling, check trail access, restrictions and the weather forecast.
Conditions may have changed. Share a report after completing the route.
Be the first to confirm a completion and help other travellers.
Allow an independent daytime outing with time for forest junctions, Ostrovnya pauses and the return train. No verified overall completion time exists. If gate access cannot be confirmed, revise the chosen section and return transport beforehand. A visit to central Zvenigorod requires additional time and a separate approach.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Arrive at Chastsovskaya railway stop and use a permitted exit towards the northern starting side, requiring a separate approach. The finish lies beside Zvenigorod station, near its bus stop. Reach the correct return platform using the current designated crossing. Check that your chosen trains stop at both stations and confirm available exits before travelling.
Arrange a drop-off near Chastsovskaya and collection on an accessible side of Zvenigorod’s station area. A car left at the start requires a separate return. Do not assume vehicle support through the woodland, or use private and allotment entrances as alternative roads.
A parking area is mapped on the south side of Zvenigorod station. Check permitted use, charges and the allowed parking duration before collecting the group; space availability is unconfirmed. Starting-side parking at Chastsovskaya has not been separately verified. Keep the bus area, railway approach and private entrances clear.
Arrive at Chastsovskaya railway stop and use a permitted exit towards the northern starting side, requiring a separate approach. The finish lies beside Zvenigorod station, near its bus stop. Reach the correct return platform using the current designated crossing. Check that your chosen trains stop at both stations and confirm available exits before.
Do not treat this as a basic child-friendly route: check difficulty, length, and trail conditions before going.
Yes, GPX and KML are available on the route page. Open the map, download the file, and use it in a navigator before your trip; key route facts: 19.3 km, hard.
Moscow region
Polushkino to Chastsovskaya: The Forest Run to Sharapovo’s Setun
24.6 km↑ 409 mHard
Prepared
Moscow region
From Zvenigorod to Sima: A Long Woodland Run via Belozyorovo
32.7 km↑ 576 mHard
Prepared
Moscow region
Polushkino to Teatralnaya: The Northern Summer Run via Kryukovo
30.6 km↑ 216 mHard
Prepared
Moscow region
Zvenigorod to Polushkino: Sima Quarry and a Setun Pause
33.2 km↑ 607 mHard
Prepared
Moscow region
Polushkino to Chastsovskaya: Two Suspension Bridges and Karinskoye
40.5 km↑ 650 mHard
Prepared
Moscow region
Skolkovo to Strogino in Summer: Hidden Ravine and the South Side of High Glade
16.4 km↑ 262 mModerate
Prepared
Reviews and questions 0
Log in to read the discussion and leave comments.
Ask about the route or its surface, or share your experience.