Elevation profile
There is no elevation data in the track for the chart.
There is no elevation data in the track for the chart.
Asphalt 30% · Dirt 13% · Compacted dirt 10% · Unknown 45%
Surface data covers 27.9 km of 50.9 km; the rest of the track is not yet classified.
No access bans or fires nearby
We check satellite fire data and regional warnings.
The description, logistics and points of interest were prepared using maps and open sources. Trail conditions may change.
Route data was imported from GPX and has not been field-verified.
Before travelling, check trail access, restrictions and the weather forecast.
Conditions may have changed. Share a report after completing the route.
Be the first to confirm a completion and help other travellers.
Time for the route | Unestablished With stops | Unestablished Reliable complete timing for a present independent passage is unavailable: confirm motorway crossings and woodland access first. Club group speeds and old outings do not establish an ordinary visitor’s duration. After checking access, plan a full daylight outing with a reserve, adding rail arrival, return waiting and any transfer separately. Allow independently for a memorial-stone approach by the Elinka.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Arrive at Zhilyovo Railway Station on the Paveletsky line. The finish lies beside Avangard Halt on the Kursk line. These are different rail approaches: check which trains call, permitted passenger entrances and return services for the day. The club plan does not establish the current timetable. Until the complete passage is checked, allow for cancelling the full outing when arranging tickets and a meeting.
Arrange delivery to Zhilyovo’s station side and separate collection at Avangard if a rail return is unsuitable. This is a linear woodland outing, leaving a vehicle at the opposite end. Agree a permitted collection approach and meeting place beforehand. Avoid trying to drive the entire running course or substituting a closed service road for an unconfirmed crossing.
Parking is unconfirmed. Establish permitted vehicle storage beside Zhilyovo’s railway arrival and terms for separately agreed collection at Avangard. A station, local road or neighbouring hotel does not establish parking for this outing. Keep passenger approaches and entrances clear.
Arrive at Zhilyovo Railway Station on the Paveletsky line. The finish lies beside Avangard Halt on the Kursk line. These are different rail approaches: check which trains call, permitted passenger entrances and return services for the day. The club plan does not establish the current timetable. Until the complete passage is checked, allow for cancelling the.
Do not treat this as a basic child-friendly route: check difficulty, length, and trail conditions before going.
Yes, GPX and KML are available on the route page. Open the map, download the file, and use it in a navigator before your trip; key route facts: 50.9 km, hard.
Moscow region
Barvikha to Volokolamskaya: Lake Generalskoye via Ilyinskoye
40.4 km↑ 560 mHard
Prepared
Moscow region
Bakovka to Kuntsevo: The 2025 Marathon via Meshchersky, Skolkovo and Romashkovo
41.1 km↑ 0 mHard
Prepared
Moscow region
New Year Run 2022: Bakovka, Three Glades, Munchausen and Nasreddin
42.3 km↑ 658 mHard
Prepared
Moscow region
Bakovka New Year Run 2023: Two Ponds, Bibigon and Kabanya Glade
41.9 km↑ 742 mHard
Prepared
Moscow region
Strogino to Perkhushkovo: Troitse-Lykovo, Podushkino Forest and Laykovo
36.6 km↑ 411 mHard
Prepared
Moscow region
Nakhabino to Molodyozhnaya: Stepanovskoye Ponds and Razdory Glades
53.5 km↑ 926 mHard
Prepared
Reviews and questions 0
Log in to read the discussion and leave comments.
Ask about the route or its surface, or share your experience.