Elevation profile
There is no elevation data in the track for the chart.
There is no elevation data in the track for the chart.
Asphalt 25% · Dirt 23% · Improved surface 5% · Unknown 41%
Surface data covers 20.3 km of 34.6 km; the rest of the track is not yet classified.
No access bans or fires nearby
We check satellite fire data and regional warnings.
The description, logistics and points of interest were prepared using maps and open sources. Trail conditions may change.
Route data was imported from GPX and has not been field-verified.
Before travelling, check trail access, restrictions and the weather forecast.
Conditions may have changed. Share a report after completing the route.
Be the first to confirm a completion and help other travellers.
Keep a separate day free, starting early and allowing for forest junctions, waterside rests and the return train. No verified overall completion time is available. If bridge access or western passages remain unclear, choose an independently planned shorter section. A Lipka pause can be planned as a rest, without assuming a fire site or facilities.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Converted to WebP, maximum 1800×1200 px, no crop.
Arrive at Nakhabino railway station and use the south-side approach to the start. Plan the return from Perkhushkovo railway stop: the endpoint is separate from the platform centre, requiring a short permitted approach. Check that your chosen train stops there and confirm the current station exit. Miitovskaya belongs to an earlier option and is not the start of this version.
Arrange a drop-off in Nakhabino and a separate collection near Perkhushkovo. A car left at the start requires an independent return plan. The Moscow River pedestrian bridge is not for vehicle support, and woodland or private roads should not be used as shortcuts.
Parking is unconfirmed. Check a permitted place near the chosen drop-off or collection point and the allowed duration. Do not count on a space beside the platform, in a residential courtyard or at a private gate. Keep railway approaches and pedestrian crossings clear.
Arrive at Nakhabino railway station and use the south-side approach to the start. Plan the return from Perkhushkovo railway stop: the endpoint is separate from the platform centre, requiring a short permitted approach. Check that your chosen train stops there and confirm the current station exit. Miitovskaya belongs to an earlier option and is not the start.
Do not treat this as a basic child-friendly route: check difficulty, length, and trail conditions before going.
Yes, GPX and KML are available on the route page. Open the map, download the file, and use it in a navigator before your trip; key route facts: 34.6 km, hard.
Moscow region
Barvikha to Volokolamskaya: Lake Generalskoye via Ilyinskoye
40.4 km↑ 560 mHard
Prepared
Moscow region
Bakovka to Kuntsevo: The 2025 Marathon via Meshchersky, Skolkovo and Romashkovo
41.1 km↑ 0 mHard
Prepared
Moscow region
From Zvenigorod to Sima: A Long Woodland Run via Belozyorovo
32.7 km↑ 576 mHard
Prepared
Moscow region
New Year Run 2022: Bakovka, Three Glades, Munchausen and Nasreddin
42.3 km↑ 658 mHard
Prepared
Moscow region
Zvenigorod to Polushkino: Sima Quarry and a Setun Pause
33.2 km↑ 607 mHard
Prepared
Moscow region
Bakovka New Year Run 2023: Two Ponds, Bibigon and Kabanya Glade
41.9 km↑ 742 mHard
Prepared
Reviews and questions 0
Log in to read the discussion and leave comments.
Ask about the route or its surface, or share your experience.